En Masse: Mass timber is poised to be faster, cheaper and greener than traditional construction materials

Jun 27, 2019
The scene looked like an elector set made for Paul Bunyon himself.

The scene looked like an elector set made for Paul Bunyon himself. Cranes lifted and placed large, prefabricated timber components that were designed and crafted off-site to fit like puzzle pieces into their preordained positions in the skeleton of Brock Commons Tallwood House, in Vancouver, British Columbia. Although the build time on the 18-story hybrid building at the University of British Columbia was not quite the 70 minutes you would see with a traditional Erector Set, the project was completed a mere 70 days after the mass-timber components arrived on site – approximately four months faster than a typical project of this size, according to Think Wood, an organization that promotes the use of soft wood timber.

RAAM Construction Completes Construction of $29 Million Affordable Senior Housing Development in LA Puente, California

La Puente, California

Developing Sustainable Multifamily Communities in the Post-COVID Era

Controlling operations cost will be of the utmost importance

Arboleda Senior Housing Construction Wraps Up in La Puente

Construction is complete on a $29 million affordable senior housing development in La Puente, CA.